EnerBox: High-Voltage Ready C&I ESS for Modern Industrial Park

2024-09-03 00:00

As a cluster of large manufacturing enterprises, the Jinsheng Intelligent Manufacturing Industrial Park(Guangdong,China)operates under consistently high electricity demand. Its 10kV grid connection and volatile load profile illustrate the classic "peak–valley" characteristics seen across many industrial zones.

How HIZENERGY enables reliable, scalable and efficient ESS for 10kV grid environments

 

4.5MW/9.4MWh C&I ESS Project

 

Background
As a cluster of large manufacturing enterprises, the Jinsheng Intelligent Manufacturing Industrial Park(Guangdong,China)operates under consistently high electricity demand. Its 10kV grid connection and volatile load profile illustrate the classic "peak–valley" characteristics seen across many industrial zones.

 

Project Challenges
During early-stage planning, park operators raised several concerns:

How to ensure long-term grid stability for manufacturing loads?
How to design a system scalable enough to match rapid industrial expansion?
The client required a system capable of long-term stable operation and seamless integration with 10kV high-voltage infrastructure——setting a very high bar for equipment reliability and control performance. As electricity consumption is expected to increase in the future, scalability of the energy storage system is also crutial.

 

Multi-unit Parallel Connection


Solutions
To meet these challenges, HIZENERGY deployed a customized solution based on 30 150kW/313.5kWh EnerBox cabinets, which supports multi-unit parallel connection to meet the requirements and forms a 4.5MW/9.4MWh park-level energy storage system—enhancing stability and flexibility.

● Scenario: Peak–valley Arbitrage
● Solution: 30 × 150kW / 313kWh EnerBox units
● Grid Voltage: 10kV
● Grid Connection Points: 2
● Protection Level: IP55 outdoor-rated design
● Scalability: MWh-level expansion capability

 

Project Value
HIZENERGY's EnerBox delivers multidimensional value for the industrial park:

1. Economic Value

The system provides stable arbitrage revenue with payback periods within three years

2. Grid Congestion Relief

By consuming and storing energy on-site, the system alleviates pressure on the local grid

3. Scalable for Future Expansion

EnerBox's modular design ensures the park can seamlessly expand capacity as electricity demand grows

With this solution, the industrial park now enjoys greater energy independence and significantly reduced electricity cost.

CONTACT

Business: overseas@hizenergy-ess.com

Service: overseas.aftersales@hizenergy-ess.com

Address:Van Voordenpark 6K, 5301 Zaltbommel, Netherlands

© 2026 HIZENERGY All rights reserved   Powered by: www.300.cn  SEO  

Business License